On May 24th, 2019, while performing conducted emissions certification testing on the technegasplus generator to CISPR 11, the TechnegasPlus Generator recorded a measurement above the upper limit for class a conducted emissions. Specifically, the out-of-specification reading occurred during the 17 second burn cycle on the active line testing while assessing quasi-peak levels.